Introduction

Red Team in Security Testing

ChecNIST guidlines for cyber security frameworks homeworks

Engagement Planning

  1. Cost and Funding (list all elements affects costs)
  2. Scope
    1. Most significant factor in red team
    2. May be complex or simple / advantage/disadvantage for redteams
  3. Duration
    1. Must be set after the scope, objectives and requirements
    2. Use scope to set timeframe not reverse
    3. Start of 2-4 weeks is good to start and can be start of largers engagements (later scopes and timeframes)
  4. Personnel Labor Cost
    1. Simultaneously to duration and scope set number of people assigned and needed
    2. Most basic team size is 2 individuals. The recommended is 4 individuals: 3 operators and 1 leader
    3. It is good to always have 2 dedicated operators. Operators can be extended and reduced according to timeframe
  5. Equipment and Software Cost
    1. Cost of softwares and equipments
    2. Softwares may be paid or free
    3. Better to have internal system inside target to reduce the cost but if the org needs an outsider redteamer to see how they gain access the cost shall be extended
  6. Travel Cost: No explanation needed/ local transport or between cities and countries
  7. Pre/Post Engagement Costs
    1. Some pre/post engagements most be considered for setting timeframe and cost and redteamers fail to consider these in setting timeframe and cost
    2. Actions before engagement (pre-engagement) like: planning, deploying equipment and softwares, developing custom tools, OSINT, …
    3. Actions after engagement (post-engagement) like: reporting